For developers: an optimized design before the permit application.
We optimize your project from concept through design for CapEx and life cycle cost. You make well-founded decisions between design options, identify cost risks early and raise the return on your project, with greater cost certainty from the start.
The most expensive decisions are made when the least data is available
The building concept, the energy system and the building systems are decided in the concept and design phases. Most of the future construction and operating cost is therefore locked in long before the building exists. Every options analysis goes through external specialist engineers and takes weeks, time the decision window does not allow. The results come back as Excel or PDF files, with no way to check the assumptions or the calculation method. Design errors only surface after the design freeze, when every redesign costs fees, time and return.
Every design option means a new assignment for the specialist engineer. By the time the answer arrives, the project has moved on and the option is no longer viable.
Estimates are delivered as results, with no derivation. Whether they were calculated conservatively or tightly cannot be checked, and they go into the feasibility calculation unquestioned.
Additional cost arises when redesign is most expensive. The difference is not borne by the design team but by the return on the project.
What Does OPTIMUSE Do?
In the concept and design phases, OPTIMUSE builds a calculable building model from a massing study, schematic design or existing drawings. Physics-based simulation shows how design options for the building and its systems affect construction cost, operating cost, energy demand and CO₂ emissions. You compare options in days rather than weeks and decide while changes are still inexpensive. Every assumption is documented in the report. The calculation runs on the EnergyPlus simulation engine in accordance with DIN 18599 and provides a basis that stands up to scrutiny by banks and investors.
Where OPTIMUSE fits into your project workflow




Numbers that stand up to scrutiny by investors and banks.
Explore different options and costs while changes are still affordable.
Transparent figures for operations, sales, and investments.
Results that inform your decision.
-
Design options compared on reliable figures
-
A robust economic analysis
-
Life cycle cost over 30 years
Project developers we work with













Frequently Asked Questions
It is most effective early on, from the concept phase until shortly before the permit application. This is where the leverage on CapEx and system selection is greatest, because changes are still inexpensive. During detailed design, OPTIMUSE reviews and optimizes changes to the design or the intended use. At handover we make sure the building goes into operation properly.
Everything produced in the course of the project, whether by specialist engineers or your own team. Relevant documents are drawings in any format, the building specification and room schedules, plus existing concepts or schematics that are to be optimized. How much data exists depends on the project phase. You can upload everything in any format.
OPTIMUSE gives you cost certainty from the early phases. You know exactly what the building needs, which configuration makes economic sense and how it affects later operation. That matters for the sale value and for certifications. The documented data basis gives investors and lenders confidence, strengthens the credibility of your project and reduces risk.
You receive first results within five business days. You get design options matched to your goals, clear recommendations and all the background information and raw data the decision rests on. You can download these documents, share them with your specialist engineers and reuse them.
We recalculate all sizing. We simulate the systems and recalculate heating and cooling loads dynamically with real weather data. From this we derive concrete optimization proposals and recommendations that measurably reduce CapEx and OpEx.
Yes. The value of OPTIMUSE shows most clearly on one of your own buildings. We are happy to start with a first project and identify concrete savings potential for your building.