We optimize your schematic design for CapEx and OpEx, identify risks and review the system design.

The most expensive decision is made at the start, with the least data.

Around 80% of life cycle cost is locked in during HOAI service phases 1 to 3, but design options are estimated rather than calculated. The result: oversized building systems, facades that never pay for themselves and decisions you cannot back up with numbers for investors and banks. Every later correction costs many times more.

What is value engineering in construction?

Around 80% of life cycle cost is locked in during the early design phases (HOAI service phases 1 to 3), yet design options are estimated rather than calculated. The result: oversized building systems, facades that never pay for themselves and decisions you cannot back up with numbers for investors and banks. Every later correction costs many times more. Energy and thermal simulations analyze your building on a physical basis and show the most cost-effective design option for your goals and requirements.

Proven Engines for Every Calculation

New building
TOUCH
Dynamic thermal simulation
Dynamic thermal simulation

With EnergyPlus we calculate dynamic heating and cooling loads at room level and simulate system efficiency over the course of a year.

Rooftop fan seen from above
TOUCH
Complex system simulations
Complex system simulations

With Modelica and CFD we model ventilation and complex HVAC systems and calculate their efficiency in detail.

Glass facade seen from below
TOUCH
Component-specific analysis
Component-specific analysis

We go down to the technical data sheets of individual components and calculate the efficiency of specific products from different manufacturers, for a reliable comparison at product level.

Building analysis results
TOUCH
Clear recommendations
Clear recommendations

You get a clear overview of where improvements are possible and what they deliver, including all raw data, analyses and simulation results.

Understanding Complexity, Reducing CapEx

Examine every aspect of the building, from the overall concept down to individual components, and see exactly where CapEx can be saved.

Customers Who Use Value Engineering

Projects that maximize your return on investment.

  • CapEx, OpEx and life cycle cost optimized over the entire service life.

  • Design risks identified early, before they become expensive during construction.

  • Systems and components compared on measured performance.

Frequently Asked Questions

What information do you need for value engineering?

Drawings, schematics and the current design are helpful. Where available, also the specific components planned (including manufacturers), an existing heating and cooling load calculation and your floor area and optimization targets. Missing information is not a problem: value engineering also works with limited data.

What is the result of value engineering?

Concrete recommendations for reducing CapEx: optimized system sizing, alternative components or manufacturers, adjusted heat pump capacities, through to entirely different system concepts. Depending on your goals and starting point, you receive the recommendations as a PDF and can download all raw data: heating and cooling load calculations, simulation data and investment cost.

Does value engineering also work for retrofits?

Yes. New construction or retrofit: every design, every concept and every existing system can be optimized and reassessed.

Do I need MEP expertise to use value engineering?

No. You only need to know what you want to optimize, plus the relevant context, requirements and goals. The results are prepared so that you can use them directly in a management presentation.

Isn't a system optimally designed anyway?

Rarely in practice. Conventional design often relies on rules of thumb and does not go deep enough into sizing, heating and cooling load calculations or detailed system efficiency. This is where much of the untapped potential lies, and a detailed simulation makes it visible.

Do I need to change my design or my processes?

No. You can upload any kind of drawings in any format, and your existing processes stay as they are. OPTIMUSE fits in without any training.

Run the numbers on your design option before it is locked in.

The earlier you run the numbers, the cheaper the correction. The demo shows how quickly it is done.