For project developers — optimized planning before submission.
The most costly decisions are made when the least amount of data is available
During the concept and planning phase, the building concept, energy system, and building services design are determined. This means that the majority of the future construction and operating costs are fixed long before the building is even built. Every variant analysis is conducted by external specialist planners and takes weeks—time that the decision-making window simply does not allow. The results are returned as Excel or PDF files, without any way to verify the assumptions or calculation methods. Errors in the design only become apparent after the design freeze, when any redesign incurs additional fees, time, and a loss of return on investment.Every alternative requires a new assignment for the specialist planner. By the time the response arrives, the project will have moved forward, and that option will no longer be viable.
Estimates are presented as results without any derivation. It is impossible to verify whether the calculations were conservative or tight, and they are included in the profitability analysis without further inquiry.
Additional costs arise when redesigning is most expensive. The difference is not borne by the planner, but by the project's return on investment.
What Does OPTIMUSE Do?
Where OPTIMUSE Fits into Your Project Workflow.




Numbers that stand up to scrutiny by investors and banks.
Explore different options and costs while changes are still affordable.
Transparent figures for operations, sales, and investments.
Results that inform your decision.
-
Comparison of alternatives using reliable figures.
-
Reliable economic feasibility analysis
-
Life-cycle costs over 30 years
Project developers we work with













Frequently Asked Questions
It is most effective when used in the early stages, from the conceptual phase through to just before submission. This is where the potential for CapEx savings and system selection is greatest, because changes are still relatively inexpensive at this stage. During detailed design, OPTIMUSE then reviews and optimizes any changes to the design or intended use. Upon handover, we ensure the building is successfully commissioned.
Everything created during the course of the project, whether by specialist planners or your own team. Relevant materials include building plans in any format, building specifications, and room lists, as well as existing concepts or schematics that are to be optimized. The amount of data available varies depending on the project phase. You can upload everything to us in any format.
OPTIMUSE provides cost certainty right from the early stages. You’ll understand exactly what the building needs, which configuration makes economic sense, and how that will affect future operations. This is crucial for sales value and certifications. The solid data foundation gives investors and lenders confidence, strengthens your project’s credibility, and reduces risk.
Yes. The benefits of OPTIMUSE are most clearly demonstrated at one of your own properties. We’d be happy to get started with an initial project and identify specific savings opportunities for your building.