MEP simulation reveals optimization potential
Cooling and heating loads reliably calculated using value engineering
The Project
The Timber Marina Tower, 113 m tall, 45,400 m². Heating, cooling and heat rejection are provided by water from the Danube.
| Key figure | Value |
|---|---|
| Height | Value113 m |
| Floor area | Value45,400 m² |
| Heating, cooling, heat rejection | ValueDanube water |
| HVAC units | Valueapprox. 20 |
| Heat emission | Valuesuspended radiant ceiling panels |
| Mechanical rooms | Valueseveral |
The system is complex. The systems were sized for maximum static design loads.
The Design Question
It needed to be determined whether these peak conditions actually occur simultaneously under real Vienna climate, usage and operating conditions, or whether the systems were oversized.
This can only be answered by analyzing actual annual operation.
From Design to Digital Twin
OPTIMUSE linked more than 100 documents, 43 drawings, plus BIM, load and MEP data into a digital twin. Geometry, systems, usage, loads, climate data and controls were consolidated into a single model.
Annual operation instead of a design case
Annual operation was then simulated based on this model: heating and cooling loads were calculated over a full year, including
- load diversity
- shading
- heat recovery
- operating hours
The simulated peak loads and comfort conditions during operating hours were evaluated and prepared as CAPEX potential for the bid.
A Peak Lasting 11 Hours
The cooling demand exceeds 2.4 MW for only 11 hours per year. A significant portion of the system’s capacity was designed to handle these hours.
The dynamic simulation replaces the theoretical design scenario with the building loads that actually coincide. This allows a smaller system to be specified in the bid without altering comfort levels or the energy concept.
| Result | Value |
|---|---|
| Simulated peak cooling load | Value−27% |
| Chiller capacity | Value−23% |
| CAPEX potential | Valueapprox. €300k |
What remains unchanged
- Comfort conditions are maintained during the defined operating hours.
- Danube water, heat recovery, and PV remain unchanged.
Additional potential lies in coils, piping, and heat exchangers.
Results
Book a free demo now
Book your free consultation now and find out firsthand how you can save money on your projects with OPTIMUSE.