For General Contractors

Import quantities from IFC and PDF drawings directly into ORCA and RIB iTWO. Process more bids without expanding the estimating department.

Estimating under time pressure, risk in the bid

OPTIMUSE speeds up your estimating, gives you transparency on cost and design options and the basis for protecting your margin. Incoming drawings are turned into a digital twin, whatever their original format, and your own standards (EIR) can be built in. From there you pull quantities straight into your estimate as needed. In parallel, an automated design check tailored to your project runs in the background. In the concept phase, design options are evaluated and priced. In the bid phase, the design is validated, risks are identified early and change-order potential becomes visible. You have the data and the alternatives you need to price and bid the project reliably.

Quantities under time pressure

Taking off quantities from 2D drawings takes days, and the bid deadline does not allow for that.

 
No independent check of the MEP design

Designs from external engineers go into the estimate unchecked. Oversizing means lost margin.

 
Risk in the bid

Without a validated basis you rely on estimates and carry the risk during construction.

 

What OPTIMUSE Does

OPTIMUSE builds a calculable BIM model from your bid documents and uses it to run physics-based simulations of the building and its systems. PDF, DWG or IFC files of any quality are sufficient as input. Before you submit your bid you receive reliable quantity takeoffs, a checked MEP design and comparisons of design options. The calculations run on the EnergyPlus simulation engine and are traceable down to every assumption.

What general contractors get from us

Building with a crane
TOUCH
Digitized data
Digitized data

Your drawings are digitized into a 3D twin, whatever their format. From it you take off lengths and areas to your own standards and transfer them straight into your estimate. You price quickly and reliably instead of working from assumptions.

Man in front of a building wall
TOUCH
Independent design check
Independent design check

We check the schematic design for efficiency and risk. Oversized building systems are identified before the bid goes out, not on site, and change-order potential becomes visible.

Construction site
TOUCH
Cost-optimized alternatives
Cost-optimized alternatives

You receive checked system alternatives as the basis for value engineering. You present the client not just with a price, but with a documented comparison of design options.

Technician at a photovoltaic system
TOUCH
Documentation for construction
Documentation for construction

You receive all raw data, including dynamic heating and cooling load calculations, as a sound basis for assessing the project. The same data can be used to issue energy performance certificates calculated to the applicable standards.

Figures that hold up in reality

Margin protected

Quantities from the model rather than from assumptions. Oversizing is caught before the bid goes out, not on site.

 
Calculable risk

Physics-based simulation identifies risks and change-order potential. You price on validated values rather than estimates.

 
A better bid

Cost-optimized alternatives and documented comparisons of design options. You win with the better bid, not the lowest price.

 

General contractors we work with

Frequently Asked Questions

At which project stage is OPTIMUSE most useful for general contractors?

It is most effective in two phases. In the concept phase, to develop concepts and design options early and present cost-effective solutions to the client. And in the bid phase, for quantity takeoff, estimating, design review and value engineering. This is where the leverage is greatest, because quantities, the MEP design and optimizations are still negotiable.

Does this also work with incomplete drawings or existing buildings?

Yes. You can upload your drawings in any format, even if they are incomplete or scans of old drawings. Where data is missing, we work with clearly defined assumptions, each of which is stated transparently. As soon as better documents are available, we refine the model. You always get back a consistent, usable data set.

Can I import an existing BIM model?

Yes. You can upload IFC models directly. We check them for quality and calculability and add missing information, so you do not have to remodel anything. Supported input formats are IFC, DWG and PDF.

How accurate are the results, and can I follow the calculation?

We combine several validated, established calculation methods, depending on the question. EnergyPlus for thermodynamic simulation: heating and cooling loads are calculated hourly, based on real weather data, building physics properties and occupancy profiles. Calculations to DIN 18599 and other standards for energy demand and the comparison of individual systems. Modelica and CFD for complex systems, such as ventilation in industrial buildings or hospitals. All engines are fully integrated. Every calculation is traceable: input data, assumptions, references to standards and results can be checked at any time.

How does the collaboration work, and who does what?

You upload your data and tell us what you need, from simple digitization through quantity takeoff to optimization or risk assessment. You receive the results including all raw data, recommendations and complete comparisons of design options.

Does OPTIMUSE replace my specialist engineer or energy consultant?

No. OPTIMUSE helps you identify risks, uncover potential and see how the project can be delivered more cost-effectively, in every project phase. Your specialists remain responsible. OPTIMUSE provides the analyses they need, faster and in more depth than is otherwise possible under time pressure.